A Quinta de Sintra School
The school building was built from scratch and consists of two floors that total a covered area of 3980m2, implanted in a land with a total area of 6250m2. In its construction, the most appropriate materials were used, not only to respond to the particularities of each of the existing valences, but also to maintain hygiene and facilitate general cleaning.
There was also the concern to find solutions and beautiful color combinations, pleasant and stimulating. The water heating system, the swimming pool and the building, uses renewable energies, non-polluting and energy-saving.
The rooms are large, have floor-level materials, appropriate to the requirements of different age groups and all have large, ripped windows that provide great natural light.